Before
After. Brian framed in the walls and has framed in for a fireplace. He wired the 6 can lights you see.
This is also his work area, so excuse the mess.
Before. The far area on the left will be the spare bedroom. On the right will be my office/craft room.
After.
Before. We did this part last spring to make a bedroom for Coleman. The door in the photo is a cold storage area. The room on the left of the hallway is just storage. It's where the water heater and furnace are. The room on the right is Coleman's.
After.
Before:
This is going to be the bathroom. The black box and pipe on the right are the shower drain and toilet sewer pipe. Notice how close they are together. We had to pay to have someone break out the concrete and move the toilet.
After. Almost done! Brian's done all the framing, wiring and tiling. We have the vanity, but it's not in yet because of the tile.
5 comments:
Wow, that looks great!
Fantastic work! I know firsthand now how wonderful it is to have a handy husband. Great job, Brian!
Wow!!!
It looks fantastic! I am going to get Chad so he can be impressed too.
I was at your house all Friday and you never even mentioned the progress on the basement let alone let me see it...thanks
Post a Comment